Case Study

T-Mobile: concept to national air in 5 business days

Two World Series spots, one week, and an air date that could not move.

Role
Senior Producer
Client
T-Mobile (via MRY) · World Series
View the full case study (PDF) →
Spray-painted World Series rivalry graphic reading 'A Mets fan gets the KC treatment' on a cinderblock wall
5 Business days, blank page to broadcast

The Ask

A national spot, five days out

T-Mobile wanted a national presence on air during the World Series — and by the time the request landed, five business days stood between a blank page and broadcast.

A production that would normally run four to eight weeks had one week: concept, production, post, network clearance, and delivery.

The air date was the one variable that could not move.

The Constraint Was the Brief

Built backward from air

With no schedule float, every decision had to be made once — no bidding round, no second shoot day, no margin for a legal note landing late. The plan was built backward from the delivery deadline, and whatever couldn't survive that math didn't make it into the concept.

Built backward from air

Network trafficking & clearance
the fixed point
Post & finish
sized to the clearance window
The shoot
one day, built for the edit
Pre-production
one compressed push
The concept
locked to what the windows allowed

The Concept

Two rivalry pranks, one shoot day

Two :15 rivalry pranks under the #TheBig7th banner, shot documentary-style with real fans for a UGC feel — the same two leads across both spots, two Bay Area locations, one shoot day.

Barber Shop spot storyboard — a Mets fan getting a Royals logo shaved into his hair, under the #TheBig7th banner

“Barber Shop”

A Mets fan gets a Royals logo shaved into his hair.

Saran Wrap spot storyboard — a Royals fan's car wrapped in Mets logos, under the #TheBig7th banner

“Saran Wrap”

A Royals fan finds his car mummified in Mets logos.

How It Got Made

Five days, one pass each

D1

Concept lock

Creative and client decision-makers aligned in a single working session. Anything that couldn't be shot in one day or cleared in one pass was cut in the room.

D2

Pre-production, one push

Crew, talent, and location locked simultaneously, not sequentially — holds converted to bookings the same day, shot list built overnight against the edit's needs.

D3

The shoot

One shoot day, planned so the edit couldn't come up short — coverage prioritized by the cut, decisions made on set, both spots captured in a single day.

D4

Edit + collapsed review

Client and creative reviewed the working cut directly — feedback consolidated into one revision pass, legal running in parallel instead of after.

D5

Finish + network delivery

Mix, conform, closed captioning, and trafficking within the clearance window — delivered on the day promised.

Why It Worked

Three decisions made the timeline survivable

1

Schedule backward

Built from the network's trafficking deadline, so every upstream date was real — not aspirational.

2

Collapse the reviews

Decision-makers in the room instead of on an email chain — every approval made once.

3

Cut scope early

A simpler idea executed perfectly beats an ambitious one delivered late.

The Outcome

On time. On budget. On air.

Both spots delivered on schedule and aired nationally during the World Series broadcast window. The production that “couldn't be done in a week” shipped — without a missed handoff, a blown approval, or an overage.

“Barber Shop” — :15 World Series spot

“Saran Wrap” — :15 World Series spot

A car bumper covered in Kansas City Royals decals, from the shoot

The Takeaway

Speed on a production like this isn't heroics — it's sequencing.

When the deadline can't move, the producer's job is to design a process where nothing has to be decided twice.